Recycling

PE/PP Film Recycling System

Contact us
PE/PP Film Recycling System

SEE IT IN OPERATION

PE/PP Film Recycling System

Start with the equipment in operation, then explore the principal functions and the relevant technical configuration.

PRODUCT OVERVIEW

Designed around the production task.

A modular PE and PP film washing process for preparation, washing and moisture reduction. Pelletizing is specified as a separate module after feedstock and end-product requirements are reviewed.

MATERIAL & PROCESS CONTEXT

Material, process and output context.

Feedstock boundary
01

Feedstock boundary

Agricultural film, industrial film and packaging film are assessed separately. Soil, labels, metals, residual moisture, bale condition and the required downstream use determine the selected route.

02

Pre-treatment and washing route

The internal candidate route may combine infeed, pre-crushing or pre-washing, size reduction, friction washing, wet separation and rinsing. The selected arrangement follows the declared material condition rather than a fixed configuration.

03

Prepared material and downstream boundary

The washing line can finish with prepared squeezed material or dry flakes. The pellet image illustrates a separate downstream step; it is not the direct output of every washing route.

04

Project confirmation

The final route, equipment list, utilities, residue handling and acceptance conditions are confirmed after feedstock and downstream-use review.

CONFIGURATION ENGINEERING

Engineering film washing process route around the actual material

A recycling system is defined from the actual feedstock and required downstream use, not from a headline model or capacity. Material condition, contamination, safety boundary and each process interface are reviewed together before a project configuration is released.

01

Material definition

Confirm polymer family, material form, incoming size, contamination profile, moisture, labels, metals, non-target fractions and any restricted or hazardous contents before selecting the route.

02

Process-route integration

The selected process interface is infeed, size reduction, washing, separation, dewatering and optional pelletizing. Each module is balanced with its upstream preparation, downstream handling and the declared target material requirement.

03

Utilities, residue and safety

Water management, residue handling, ventilation, access, guarding and site constraints are defined with the actual material and local operating conditions; they are not assumed from a generic reference line.

04

Project confirmation

The final equipment list, operating window, controls and acceptance criteria are confirmed through project engineering, controlled technical review and the agreed validation plan.

FOR A TECHNICAL PROPOSAL

Information that lets us define the right line.

  • Material form, contamination, moisture, labels, metals and target output
  • Clear material photos or representative samples, including packaging and contamination condition
  • Required target material, downstream use and any purity, moisture or handling expectations
  • Factory layout, utilities, water-treatment boundary, safety rules and local regulatory requirements
  • Required controls, service access, documentation language and project delivery expectations

This v2 Beta page presents the R&D-signed technical reference for the stated material and process scope. It is not a price, delivery, quality, certification or contractual performance commitment; the final project configuration and acceptance conditions remain subject to controlled engineering review.

TECHNICAL DATA

PE/PP film washing line configurations

Internal routeFeedstock / conditionInternal design platformNominal platformPrepared material
WASH-SOL-001 · Agricultural filmPE/PP agricultural film; source, contamination and bale condition reviewed800–1,200 kg/h1,000 kg/hPrepared squeezed material for the selected downstream use
WASH-SOL-002 · Industrial / packaging filmPE/PP industrial waste film and packaging film; source and contamination reviewed400–600 kg/h500 kg/hPrepared dry flakes for the selected downstream use

WASH-SOL-001 · Agricultural film

Feedstock / condition
PE/PP agricultural film; source, contamination and bale condition reviewed
Internal design platform
800–1,200 kg/h
Nominal platform
1,000 kg/h
Prepared material
Prepared squeezed material for the selected downstream use

WASH-SOL-002 · Industrial / packaging film

Feedstock / condition
PE/PP industrial waste film and packaging film; source and contamination reviewed
Internal design platform
400–600 kg/h
Nominal platform
500 kg/h
Prepared material
Prepared dry flakes for the selected downstream use

Internal candidate only. Each row is one design platform, not separate models or a promised output. Final configuration, utilities, material quality and validation remain subject to project review.

PRODUCT INQUIRY

Discuss this system with Grace.

Share your raw material, product specification, capacity target and project country.

Email info@gracepm.com